Change Order Of Direct X Devices
-
Hi all ,
Does anyone have a proven way to change the order of DX devices? I tried unplugging (usb) and plugging back in,no joy.I’ve already DL’ed the DX Key.file to the user cfg.folder using the instr. from the Manual.
I’ m trying to set stick,throttle in 4.34, I do not have any previous iterations of BMS.I have not set any device up in CH other than drivers.
Thanks in advance
Hickory -
Falcon BMS 4.34\User\Config
-> DeviceSorting.txtDoes exactly what you’re looking for.
-
You may want to try “PJP JoyIDs” application.
https://theairtacticalassaultgroup.com/forum/showthread.php?t=13009
-
@Eagle-Eye, yes sir I looked at that txt. file and it has the same order as in my windows devices and imputs . I don’t know how to change the order in notepad and if i did so would that screw BMS up.I want to change order from:Throttle in first line,peddles in second line,stick in third line to:Stick in first line, Throttle in second line ,etc.
@Raptor,Tks for the heads up,i’m still quite a novice when it comes to computer stuff.Will take a look though.
Tks in Advance,Hickory
-
@Eagle-Eye, yes sir I looked at that txt. file and it has the same order as in my windows devices and imputs . I don’t know how to change the order in notepad and if i did so would that screw BMS up.I want to change order from:Throttle to Stick
Peddles Throttle
Stick PeddlesIf you copy the entire line and move it to where you want, it works.
E.g. my file:
{0400044F-0000-0000-0000-504944564944} "Thrustmaster HOTAS Cougar" {B351044F-0000-0000-0000-504944564944} "F16 MFD 1" {B352044F-0000-0000-0000-504944564944} "F16 MFD 2" {C2AB046D-0000-0000-0000-504944564944} "Logitech G13 Joystick" {076306A3-0000-0000-0000-504944564944} "Saitek Pro Flight Rudder Pedals"
Say I wanted to have my MFDs before anything else, I would simply move the Thrustmaster HOTAS Cougar line down
{B351044F-0000-0000-0000-504944564944} "F16 MFD 1" {B352044F-0000-0000-0000-504944564944} "F16 MFD 2" {0400044F-0000-0000-0000-504944564944} "Thrustmaster HOTAS Cougar" {C2AB046D-0000-0000-0000-504944564944} "Logitech G13 Joystick" {076306A3-0000-0000-0000-504944564944} "Saitek Pro Flight Rudder Pedals"
-
I was kinda hoping its that easy,will give it a try.Tks Eagle-Eye.
Cheers